Inflow

 

HEI Construction performed a Data expansion build out of 10,000 SF with 75 watts SF of leasable client space. The expansion required six new CRAC units with associated rooftop units to accommodate the projected heat load. Supplemental structural steel was installed below the underside of the existing metal deck and roof joist for support of the new RTUs and cooling tower. Hogan installed 10,000 SF of raised access flooring which provided an accessible plenum for below floor electrical troughs and CRAC unit piping. A dock leveler was installed for easy client equipment deliveries onto the leasable space. This was a negotiated project for Hogan Innovations.