Emory University – O. Wayne Rollins – Research Building – 3086 Research Lab
HEI worked with Emory to expand and modernize the OWR
HEI renovated the Northside Parkway Harry Norman Office, including Lobby, Reception and Office areas. Existing carpet and slate tile were removed in the Lobby area and a forty-year old slab was exposed. Slab areas were patched, then scored in a checkerboard pattern and stained. New wood crown and base was installed along with, a new reception desk, stone countertops and miscellaneous office cabinetry throughout. The exterior façade was pointed, patched and painted. The end product was a clean crisp office exterior and interior update.
HEI worked with Emory to expand and modernize the OWR
The project started as the renovation of the Methodist Church
The 2152 Research Laboratory project, located on the 2nd Floor